Week beginning Monday
12th March- We were given the final major project brief and had
to go away and research ideas and other artists, I researched artists including
Cornelia Parker and Thomas Heatherwick to see what ideas I could think of from
those, I also produced an artist’s research book on different interiors and
structures I had found on google images, and looked at existing google offices .
Week beginning Monday
19th March- We had a group tutorial to discuss each others
ideas, which got my ideas flowing and I chose out of my two ideas to do an
interior brief. I researched into certain objects including bike tyres, sinks,
fridges and other household appliances, I added to my blog about my research
and ideas and drew my ideas.
Week beginning Monday
26th March- I found some drawers in the college skip and spent
the Monday looking at how they could be arranged in an interesting way for an
interior to be added, I so wrote on my blog about the ideas I was having.
Week beginning Monday
2nd April- I finally found a way to display the drawers in an
interesting manner, and took pictures and drew into them to figure out how an
interior would work inside them. I updated my blog with ideas and thoughts and
added more drawings to my sketchbook for the interior of my drawers.
Week beginning Monday
9th April- I made my mind up and decided to cast the inside of
the drawers out of wood, and began to take measurements and began cutting out
wood on the band saw and putting it inside the drawers to see how it would
work.
Week beginning Monday
16th April- I made my mind up and decided to cast the inside of
the drawers out of wood, and began to take measurements and began cutting out
wood on the band saw and putting it inside the drawers to see how it would
work.
Week beginning Monday
23rd April- I worked out how the wood would need to be joined,
and made small blocks of wood at angles which would make the piece resemble the
drawers. I used wood glue to begin to attach each piece onto each piece of
wood. I highlighted on my blog where I was up to and the thoughts and processes
I had been through.
Week beginning Monday
30th April- I glued my model together at certain areas but couldn’t
do it all because I needed more blocks of wood on the edges, I encountered a
few problems during glueing as the model kept falling apart, but they were
fixed in the end. I made more blocks of wood for each end of each block of
wood. I glued these on as well and my model was beginning to become more of a
structure.
Week beginning Monday
7th May- I had to go back unfortunately and repair bits which
had fallen off over the weekend, I updated my blog with the work which I had
been doing over the past week. And drew some interior images on google sketch
up and drawings, I thought about how I could design my office interior. I
decided to making a large scale Perspex model and a bigger version off my wooden
model but only two floors juts highlighting the interior.
Week beginning Monday
14th May- I began producing my foam board model as a template
for my Perspex model, and began drawing interiors ready for me to cut out some
foam board. After producing this on the Monday, I started making the base for
my Perspex model on the Wednesday, I glued the base together and added a
supportive piece which held up the floor, and I started on making the interior
by going off my google sketch up designs.
Week beginning Monday
21st May- I made interior pieces by using the disc sander, band
saw and the buffing machine, I also began making the stairs for my interior, and
they were finished by the Friday as they were the tricky part. I glued down one
floor of my interior on wednesday which I had been making all week. On Friday I
produced drawings and began making and sanding the next floor.
Week beginning Monday
28th May- I began adding pink Perspex onto my design to
highlight the structure of the building and the structure of the interior, and
made the base for my model before gluing down the pink Perspex. I glued down
all remaining Perspex pieces on the Wednesday and began spraying my wooden
model white on the wednesday using a white primer and on the Friday I finished
it using white spray paint. Updated blog on Perspex model.
Week beginning Monday
4th June- I printed off my google sketch up work and added more
sketchbook drawings over this week because it is half term. I also updated my
blog.
Week beginning Monday
11th June- I collected my google sketch up images and sketchbook
prints and mounted them on foam board, I painted my table for my foam board
model and put it into my space once painted. I began evaluation for the project
and began arranging my exhibition on the Wednesday. On the Friday the day of
the exhibition I put all my work on the wall using a ruler and a tape measure
making sure they were straight and arranged everything into its place ready for
the show at 7pm.
Weekend before the
deadline- Saturday 16th and Sunday 17th- Finished
sketchbook, finished evaluation, added finishing touches to my blog and got all
work ready and prepared for Monday 18th Deadline day.